
FEED PELLET MILL · SZLH · 2–35 T/H · Ø350–768 MM

ALBADAR FEED · KABUL · 20 T/H TURNKEY
Production lines
Single Super Phosphate plants from 50 to 200 tonnes per day — rock phosphate and acid in, cured, granulated, bagged SSP out.
SEMZON SSP plants cover the full process chain: rock grinding, acidulation, den curing, granulation, screening and bagging, with materials handling and structures fabricated in our own works.
The Auriga installation in Karachi is our standing reference for fertilizer-scale process fabrication delivered turnkey.
Complete process from acidulation to bagging; corrosion-conscious materials selection; structures and handling fabricated in-house.

Six stages
Every SEMZON line follows the same accountable flow — see it animated on the homepage plant-flow.
Start a conversation
Send drawings, capacity targets, or just an idea. A SEMZON engineer replies within 24 hours — usually sooner.